Contents

ENGR333 project Fall 2018

Description

The Fall 2018 ENGR333 project focused on renewable energy generation.

I asked the students “What is the largest possible reduction in Calvin’s annual energy costs from a $5M investment in renewable energy?”

Customer

The customer for this project was Russell Bray, Director of Calvin’s Physical Plant.

Documents

Details about the project can be found at the following links:

2018 Fall ENGR333 project assignment

2018 Fall ENGR333 project final report (Section A)

2018 Fall ENGR333 project final report (Section B)

2018 Fall ENGR333 seminar presentation

2018 Fall ENGR333 poster