The Spring 2017 ENGR333 project focused on campus energy consumption.

I asked the students “Can you construct a fine-grained, bottom-up electricity demand model that predicts the annual electricity consumption for the dormitories (section A) and the PE complex (section B) for each year of the last decade with an accuracy of ±2%?”

Customer

The customer for this project was Jack Phillips, Assistant Director (Mechanical) at Calvin’s Physical Plant.

Documents

Details about the project can be found at the following links:

2017 Spring ENGR333 project assignment

2017 Spring ENGR333 project final report (Section A)

2017 Spring ENGR333 project final report (Section B)

2017 Spring ENGR333 seminar presentation